Meghri hydro power plant to operate in five years

14:00 • 08.11.12

In five years Armenia and Iran will put into exploitation Meghri hydro power plant, the foundation laying ceremony of which took place November 8 in Armenia’s town of Meghri.

 

Armenia’s President Serzh Sargsyan, Energy and Natural Resources Minister Armen Movsisyan, Iranian delegation headed by the co-chair of the Armenian-Iranian inter-governmental commission Majid Namuji attended the event.

 

Movsisyan said the construction of the hydro power plant on Arax River is first of all important in regard to development of economic cooperation between the regions of the two countries. He said the construction’s feasibility study was done by Iranian Mahab Ghods consulting company.

 

“The study was coordinated and supervised by Armenian-Iranian joint committee. Another two hydro power plants are expected to be built on Arax River – Meghri plant on the Armenian side and Gharachilar – on the Iranian,” Movsisyan said.

 

After the end of the construction the electricity produced by Meghri plant will be transferred to Iran for 15 years after which the plant will be handed to the Armenian side for free.

 

“Applying of hydro power diplomacy is one of the means to establish peace, stability, prosperity in the region,” Iranian energy minister said, rating high the role of water diplomacy in the world.

 

The Iranian official stressed that the implementation of such economic projects will promote the welfare of the people, stressing that the construction of Meghri and Gharachilar power plants were the expression of the common will of the two countries.

 

The contract on construction of hydro power plant on Arax River has been signed between the governments of the two countries still in 2007 and ratified by the parliaments of the two countries in 2008.