Armenia, Iran consider development of third power transmission line
15:00 • 10.07.21
General Director of the High Voltage Electric Networks, CJSC Hayk Harutyan and director of Sunir, Mansur Saeidi, held a video talk on July 7 to discuss the ongoing construction of the third high voltage power transmistion line.
The sides agreed on plans for promoting a regular exchange and organizing mutual visits, ARMENPRESS reports.
The Armenian Embassy to the Islamic Republic also joined the online forum.
Placeholder









