The drilling of the 2nd tunnel of Kajaran-Agarak road has started
18:55 • 22.07.25
Drilling works of the 2nd tunnel envisaged by the draft in the 32 km road section of the North-South Trch-4 have started. This tunnel will have 530 m long.
This was reported by the "Traffic Department" Foundation.
Placeholder









